Recovered record / complete transcription
Corruption Energy Book I: Opening Inspection
Corruption Energy Development Facility
Page divisions, capitalization, wording, and intentional line breaks are preserved from the recovered book.
- Page 1
CORRUPTION ENERGY DEVELOPMENT FACILITY INITIAL OPERATIONS LOG The facility is now considered operational. Construction crews have cleared the primary halls for executive inspection.
- Page 2
Most laboratory equipment has not yet arrived. Current inventory consists of storage crates and machinery recovered from the collapsed Volcanic Research Facility.
- Page 3
Twenty Cowdonia executives are scheduled to inspect the facility today. All personnel must remain at their assigned stations until the tour concludes.
- Page 4
Prison labor has completed final repairs and moved equipment into the lower development wing. One prisoner, identified as Henry, has repeatedly requested access to the executive level. Denied.
- Page 5
Henry claims several visiting executives were responsible for conditions at the former General Research Facility. Security will return him to holding after the inspection.
- Page 6
The executive group has entered the main chamber. The refined Corruption reservoir is stable and ready for demonstration. Dr. Tali is requesting clarification regarding the Mako trial.
- Page 7
Henry is no longer in the labor wing. Security reports missing explosives from the old Volcanic equipment crates. Seal the executive chamber. Find him immediately.
- Page 8
An unauthorized device has been detected beneath primary containment. DETONATION DETECTED CONTAINMENT FAILURE EVACUATE FACILITY
- Page 9
The reservoir has ruptured. Corruption is spreading through the development wing and entering the ventilation system. Executive chamber unresponsive. Twenty life signals lost.
- Page 10
All underground exits are obstructed. The substance is filling the halls faster than emergency doors can close. It is no longer behaving like stored energy. It is growing.
- Page 11
FROZEN OCEAN MAKO CONNECTION TERMINATED FACILITY POWER LOST EMERGENCY TRANSMISSION FAILED FINAL SYSTEM STATUS: OVERRUN